Flooring that withstands both sports and academics!

Northern Industrial Flooring has proudly partnered with educational institutions throughout the Midwest, delivering high-performance flooring solutions hat stand up to the demands of busy campuses. Our experience includes projects at Prairie Heights High School, Northridge High School, the University of Notre Dame, the University of Michigan, and many other K-12 schools, colleges, and universities.

From science laboratories and commercial kitchens to cafeterias, maintenance facilities, and athletic venues like Notre Dame’s iconic Joyce Center, our team installs flooring systems engineered for safety, durability, and long-term performance. Many of these facilities feature the Res-Tek Urethane Cement System, a seamless flooring solution designed to withstand heavy foot traffic, moisture, thermal shock, chemical exposure, and the rigorous daily demand of educational environments.

Whether renovating an existing facility or constructing a new campus building, Northern Industrial Flooring delivers flooring systems that provide lasting value while minimizing maintenance and downtime.

Ready to talk about your educational facility flooring?  Give us a call today!

800-424-8914

Request A Quote

Tell us about your project at your facility.  Our team will contact you within one (1) business day.

Request for Flooring - Schools
Name
Name
First Name
Last Name

Schools & Universities

Arena with a freshly installed concrete floor under construction; orange/yellow work fan and a large cable reel on the floor, logo reads 'Northern Industrial Flooring' in the foreground.

Notre Dame Case Study

The Challenge: A Complicated flooring structure that limited the use of heavy machinery and lifts and the client needed a flooring system that could handle all types of events.

Notre Dame Case Study:  Page 1    Page 2

Prairie Heights Middle School

Indoor industrial space with a long stretch of fresh gray epoxy flooring; logo for Northern Industrial Flooring is in the foreground.

The Challenge: A quality and durable system that could be installed over existing ceramic tile to save on cost of removal.

Prairie Heights Case Study: Page 1   Page 2